Energy Storage System Solutions

Grid-side ESS Solutions

Retard the upgrading of power distribution network, respond to the fault occurred on transmission lines, participate in auxiliary services, such as frequency modulation and peak-shaving, etc. Enhance the reliability of gird.

Solution Features
Networking Diagram
Solution Products
EH-4000/4400/4800-HA-MR-US-34.5kVEH-3800/4000-HC-UD-US-34.5kV

    point.png200 kW fold expansion up to 4.8MW inside 30 ft structure

    point.pngOnly need to power off each single failed battery cluster  

    point.pngSolve SOC imbalance between different battery clusters  

    point.pngBuilt in Energy Management Unit support IEEE 2030.5

    point.pngPower Module easily replacement reduce repair time 

    point.pngAllow expand new battery cluster to the old system 

    point.pngBattery system achieve more deep DOD ability 

    point.pngMore easily to perform periodic battery calibration


    point.pngPCS Max. efficiency up to 98.9% 

    point.pngFull reactive power four-quadrant capability 

    point.pngSupport VSG function 

    point.pngMillisecond-level Power response to EMS/SCADA

    point.pngNEMA TYPE 3R protection 

    point.pngBlack start ability 

    point.pngTwo DC branch inputs 

    point.pngDesigned for Desert Scenario with 50℃ option


Solution Projects

18MW 9MWh Energy Storage Project in Hunan, China.1

18MW 9MWh Energy Storage Project in Hunan, China.2

18MW 9MWh Energy Storage Project in Hunan, China.3

20MW/40MWh Energy Storage Project in Hunan, China

18MW 9MWh Energy Storage Project in Hunan, China.1

18MW 9MWh Energy Storage Project in Hunan, China.2

18MW 9MWh Energy Storage Project in Hunan, China.3

20MW/40MWh Energy Storage Project in Hunan, China