Home
Solutions
Products
Projects
Service
About Sineng

PV System Solutions

C&I Rooftop Solutions

Installation capacity is generally 500kW~6MW Inconsistently oriented modules with some occlusions.

Solution Features
Networking Diagram
Solution Products
SP-110K-L SP-50/60K-L

    point.png DC switch configured for safe operation and maintenance

    point.png 10 MPPTs design, overload ratio is up to 1.3

    point.png Wireless communication supported to save communication cable cost

    point.png Maximum branch current 13A, suitable for bifacial module

    point.png Three-level + soft switching technology, ultra-wide MPPT voltage range

    point.png DC switch configured for safe operation and maintenance

    point.png 3 MPPTs design, overload ratio is up to 1.3

    point.png Wireless communication supported to save communication cable cost

    point.png Three-level + soft switching technology, ultra-wide MPPT voltage range

Solution Projects

100kW PV Plant in Jiangsu, China

300kW PV Plant in Jiangsu, China

5MW PV Plant in Jiangsu, China

28.5kW PV Plant in Gangwon-do, Korea

100kW PV Plant in Jiangsu, China

300kW PV Plant in Jiangsu, China

5MW PV Plant in Jiangsu, China

28.5kW PV Plant in Gangwon-do, Korea