Utility Energy Storage Solution
Sineng offers comprehensive utility-scale energy storage system solutions, including both string and central PCS. With exceptional performance, elevated efficiency, and utmost safety, these solutions play a crucial role in ensuring grid stability, enhancing grid resilience, and facilitating peak shaving to meet the diverse needs of customers.
Solution Features
-
Flexible Application
· Wide DC voltage operation window, full power operation at 1500 V
· Supporting parallel connection and easy system expansion
· C4 anti-corrosion for the entire product, with optional C5 anti-corrosion based on the application environment
· High protection level, suitable for diverse outdoor installations
· Compatible with batteries above 280Ah -
Simple O&M
· Modular design of core components, easy installation, efficient maintenance · Modular design, breakdown of a single unit will not affect the operation of other equipment · Support program upgrade of the whole site
-
Exceptional Performance
· Adopting I-type 3-level technology, the Max. efficiency up to 99%, improving charging and discharging efficiency · No Derating in operating conditions up to 45℃ · Support full power four-quadrant operation
Networking Diagram
Cases
-
150MW/300MWh Energy Storage Project in Gansu, China-
Inverter
EH-3150-HA-UD Central PCS -
Capacity
150MW/300MWh -
Location
Gansu, China
-
-
100MW/200MWh Energy Storage Project in Shanxi, China-
Inverter
EH-3450-HA-UD Central PCS -
Capacity
100MW/200MWh -
Location
Shanxi, China
-
-
100MW/200MWh Energy Storage Project in Shandong, China-
Inverter
EH-3150-HA-UD Central PCS
EH-3450-HA-UD Central PCS -
Capacity
100MW/200MWh -
Location
Shandong, China
-