About Sineng
News
Events
Cases
Join Us
Solutions
PV System
Energy Storage System
Power Quality Control System
Residential PV System
Commercial PV System
Utility-Scale PV System
Residential Solar-Plus-Storage System
Commercial Storage System
Utility-Scale Storage System
Power Quality Control System Solution
Products
PV Inverter
Energy Storage
Monitoring & Accessories
Power Quality
Products List
SN3.0/4.0/5.0/6.0/8.0/10/12PT
SN12(X)/15/17/20/25PT
SN25(X)/30/33/36/40PT
SN50/60PT
SN100/110/125PT
SP-120K-BL
SP-275K-H1
SP-350K-H1
EP-3125-HC-UD/EP-3400-HA-UD
EP-4400-HA-UD
EP-3125-HC-UD/10~35, EP-3400-HA-UD/10~35
EP-3300-HB-UD10~35/EP-3125-HB-UD10~35
EP-3600/3750-HAN-UD/10~35
EP-6250-HA-UD/10~35
ITS-6500-MV
EP-8800-HA-UD/20~35
ITS-8960-MV
SN3.0/3.6/4.0/5.0/6.0HS
SN5.0/6.0/8.0/10/12/15HT
RHP7.0/10/14/17/21-G1
EH-0200/0215-HA-M
EH-2400/3200-HA-MR-35
EH-1250-HB-UD
EH-1725/2000-HA-UD
EH-3450/4000-HA-UD-35
EH-5000-HB-UD-35
EnjoySolar
Si-Logger
Si-Dongle
MU-S2
Active Power Filter (APF)
Static var generator(SVG)
Intelligent Power Quality Correction Device
Service & Support
Online Service
FAQs
Downloads
Warranty
Contact Us
Global Contact Information
Contact Form
English (Global)
Back
Share:
January 06, 2025
Ngari Prefecture, Tibet, January 6, 2025 -- Sineng Electric is proud to announce the successful commissioning of a 6MW/24MWh grid-forming energy storage project in Tibet, China, situated at an average altitude exceeding 4,500 meters. To address the project's challenging conditions, including high-altitude derating and a requirement for up to three times overloading capacity, Sineng Electric provides a tailored grid-forming energy storage solution. The installation includes three units of Sineng 6.4MW central PCS MV turnkey stations, specifically engineered to optimize performance in such a demanding environment.
As an expansion of the 30MWp solar PV power plant, the energy storage project plays a pivotal role in enhancing the integration of solar energy into the local grid. In addition, it strengthens the resilience of the regional power infrastructure, providing a stable and reliable energy supply for the area's residents.
During the delivery and commissioning phases, the Sineng team navigated one of the coldest periods of the year in Ngari Prefecture, where heavy snow and rugged mountain terrain posed significant logistical challenges. Despite these harsh conditions, the Sineng team demonstrated exceptional expertise and perseverance, successfully completing the commissioning and system testing, which received high praise from the customer.
This energy storage facility deploys Sineng 6.4MW grid-forming central PCS MV turnkey stations, configured with four 1.6MW central PCS units. These units incorporate VSG technology, along with an advanced control algorithm featuring virtual excitation voltage, virtual impedance/power angle, and inertia damping. The cutting-edge technology offers significant improvements in control logic, response time, and system robustness under grid disturbances.
Sineng Electric continues to lead the way in energy storage technology, with its solutions supporting multiple operational modes, including grid-following, grid-forming, and grid-off configurations. This versatility makes Sineng Electric's PCS solutions adaptable to a wide range of applications. As the energy landscape continues to evolve, Sineng Electric remains committed to advancing innovation and promoting sustainable energy solutions across the globe.
Sineng Electric is the global leading supplier of a comprehensive product portfolio including PV inverters, energy storage inverters, and power quality products.
By establishing four R&D centers and leveraging top-notch resources, Sineng's unwavering commitment to technological innovation has enabled more people to access cost-effective, reliable, and sustainable energy. Known for the engineering excellence, rigorous testing standards, and consistent quality, Sineng has earned recognition as a BloombergNEF tier 1 PV inverter maker and ranks No.4 in global PV inverter shipments for 2023.
Learn More
December 16, 2024
November 07, 2024